Please use this identifier to cite or link to this item: http://bibliotecadigital.economia.gov.br/handle/123456789/522504
Title: Análise da execução da carteira de projetos rodoviários do PAC/DNIT no período 2007-2017
Authors: Silva, Mauro Santos (Orientador)
Keywords: infraestrutura
empreendimentos rodoviários
Programa de Aceleração do Crescimento
desenvolvimento econômico
Issue Date: 6-May-2019
Publisher: Escola Nacional de Administração Pública (Enap)
Abstract: O presente estudo tem por objetivo analisar o desempenho da carteira de empreendimentos rodoviários do Programa de Aceleração do Crescimentos - PAC, sob responsabilidade do DNIT, de 2007 a 2017. Para tanto, foram analisados 227 empreendimentos no período. O foco na análise da carteira do PAC foi na execução orçamentária e financeira e também na execução física, com base nos empreendimentos concluídos, com intuito de avaliar o desempenho da carteira. O resultado confirmou a hipótese do trabalho e demonstrou que mesmo havendo disponibilidade orçamentária/financeira, a execução orçamentária manteve uma média de 43% no período. Em termos de avanço físico, foram concluídos 4,8 empreendimentos por ano, em média. No entanto, mesmo que os projetos de infraestrutura não apresentem elevado desempenho, eles continuam sendo necessários e considerados importantes para o desenvolvimento econômico e social do país, remetendo ao paradoxo dos megaprojetos, de Flyvbjerg.
The goal of this study is to analyze the performance of highway projects within the Growth Acceleration Program (PAC), under the responsibility of the National Department of Transportation Infrastructure (DNIT) between 2007 and 2017 were analyzed 227 different projects. The analysis of the PAC´s project portfolio was focused on budget and financial execution and the progress of the construction work, in order to evaluate the portfolios performance. The result of the study confirmed its hypothesis and showed that even though there was budgetary/financial availability, budget execution maintained an average of 43% and in terms of physical progress, and 4.8 projects were concluded each year on average. However, even if infrastructure projects do not perform well, they are still necessary and considered important to the social and economic development of the country, referring to Flyvbjerg´s paradox of megaprojects.
URI: http://bibliotecadigital.economia.gov.br/handle/123456789/522504
Other Identifiers: http://repositorio.enap.gov.br/handle/1/3985
Appears in Collections:Especialização Enap - Trabalhos de Conclusão de Curso (TCC)

Files in This Item:
There are no files associated with this item.


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.